Seeking improvements and optimisations for an existing plant?
Considering an alternative energy source? 🤔
We have recently been requested to conduct a study of the existing Water Recovery Center in the UK. The study includes 11 kV, 3.3 kV installations and LV equipment 🤓
We began with a site survey to amass all prerequisite information to prepare a detailed model of the existing electrical installation in PowerFactory by DIgSILENT.
Based on the model, we have prepared:
✅ Load Flow Study for a various configurations
✅ Fault Level Study
✅ Protection Philosophy Review and Dynamic Simulation
Next step will be to prepare an evaluation and simulation of the electrical model for future network design taking into account new renewable sources of energy and all possible changes in system 🤯😉