Poland
Customer:
POSCO E&C
Introduction/challenge:
The EPC contractor was oblivious to the very strict local regulations and standards which had to be explained and then applied in the basic and detailed design of the E&I scope. Installation works were conducted at the same time as the design study.
Solutions:
We provided thorough consulting services on the Polish standards and regulations and worked in two locations – our design office on construction site thus ensuring close cooperation of electrical designers, the installation contractor and the customer.
Scope of design:
Customer:
Termomechanica Ecologica
Introduction/challenge:
TME continued works and deliveries within the WtE plant as a replacement of the previous EPC Contractor who left the site. Our challenge was to deliver E&I&C studies for the overall plant within a very tight schedule. The studies were supposed to include existing solutions and their adaptation to the new process requirements from TME.
Solutions:
The works were carried out in office and on site simultaneously together with site surveys. Our engineers supported the on-site installation teams and took part in commissioning and start-up.
Scope of design:
Great Britain
Customer:
Babcock Willcox Volund
Introduction/challenge:
We were faced with a challenge related to the relatively big step-up transformer, around 45 MVA, and low short-circuit power in system – there was a voltage drop in the MV network when switching on the transformer.
Solutions:
We used the pre-magnetisation system and magnetised the transformer core with a diesel generator. Thanks to this solution, the switching on of the entire facility was unnoticeable for the overall power system.
Scope of design:
Sweden
Customer:
Serneke AB
Introduction/challenge:
The challenge was about conducting our scopes within the building information modeling standard (BIM).
Solutions:
We had to adjust the software used for 3D modeling.
Scope of design:
Comprehensive design for the administration/civil works including HVAC, fire protection system, access control, lighting, emergency lighting, underground earthing system
Customer:
Steinmueller Babcock Environment
Introduction/challenge:
Electrical works were conducted at the same time as the design study. Implementing a detailed support material for cable raceways into the 3D model posed yet another challenge.
Solutions:
We had to adjust our lightning sphere visualisation and the software for 3D modeling with regards to supporting materials.
Scope of design:
France
Customer:
CNIM SA
Introduction/challenge:
The design had to be in line with the national French standards and regulations including the process areas, normal emergency lighting with socket boxes and distribution board.
Solution:
We had to improve our calculations methods with the new software pursuant to NF C15-100.
Scope of design:
Customer:
CNIM SA
Introduction/challenge:
As a result of modernisation and energy optimisation of the plant, the project was done in a short time within a very tight and detailed schedule.
Solutions:
We had to optimise electrical activities on site and organise adequate resources to complete the task.
Scope of design:
Other projects
Customer:
CNIM SA
Introduction/challenge:
The project was executed in 2 phases: 1. phase included preliminary design to obtain the building permit, we had very little input data at hand; 2. phase included detailed design for construction.
Solutions:
All documentation prepared was successfully approved and the permit granted solely thanks to the experience and expertise of our designers.
Scope of design:
Customer:
CNIM SA
Introduction/challenge:
A very detailed design was required to optimise the time schedule, site activities and material logistics.
Solutions:
A completed detail design study was performed including 3D design false floors, bend radius cable simulation, supporting structures for cable routes and detailed BOQ.
Scope of design:
VAT No 6832105801
KRS 0000791839
REGON 383681032
Enetecs sp. z o.o. is registered in the District Court for Kraków Śródmieście, XII Commercial Division, share capital: PLN 5.000
PLN 88 1050 1445 1000 0090 3218 0524
EUR 66 1050 1445 1000 0090 3218 0532
GBP 32 1050 1445 1000 0090 8090 0849
SWIFT/BIC INGBPLPW