plant operation support and maintenance

where we have gained our expertise

factory_ref

references

Great Britain
  • Energy from Waste Plant, Dunbar
  • Energy from Waste Plant, Ardley
case_study

case studies

Great Britain

Customer: 

Viridor

Introduction/challenge:  

The plant could not receive incoming power from the local electrical grid and the STG is out of service, and thus could not operate to meet the business requirements

Solutions:   

We prepared four solutions to the problem, out of which two best scenarios were developed in details including simulation of operation, checking selected solutions in terms of their impact on the entire system, suggesting next steps, checking protection against electrical shock through the system, and finally estimating the overall cost of implementation.

Customer: 

Viridor

Introduction/challenge: 

During yearly general outage, critical equipment should be checked and tested in order to ensure that it will not break down during normal operation of plant. We have been asked to provide general maintenance and tests on all UPS units installed within the plant such as: main AC UPS unit, 110VDC unit, UPS for Turbine Emergency Lube Oil Pump. 

contact_icon
Enetecs
engineering technologies

VAT No 6832105801
KRS 0000791839
REGON 383681032

Enetecs sp. z o.o. is registered in the District Court for Kraków Śródmieście, XII Commercial Division, share capital: PLN 5.000

PLN 88 1050 1445 1000 0090 3218 0524
EUR 66 1050 1445 1000 0090 3218 0532
GBP 32 1050 1445 1000 0090 8090 0849
SWIFT/BIC INGBPLPW

contact form