Specialised in WtE plants as we are, we are glad to be adding yet another one to our portfolio – the Municipal Solid Waste Incineration Plant in Warsaw 🎉🎉🎉
For our Client, Posco E&C, we will be preparing the MV design works including:
✅ preparation of design for primary circuits
✅ telemechanic design
✅ preparation of protection settings
✅ design of measurement circuits
✅ reconciliation of design with the Contract Engineer and the Grid Operator
✅ preparation of cooperation instruction with the Grid Operator
So excited to be able to do what we do best in Poland! 🤗💪