France
Customer:
CNIM SA
Introduction/challenge:
Our site engineers were responsible for solving all issues on site with cables route clashes according to the 3D model and the site reality, cable list issue (cable type modification & calculation), terminations for the EPC contractor. The verification of the electrical package completion for hand over to the commissioning phase
United Arab Emirates
Customer:
CNIM SA
Introduction/challenge:
Our site engineer was dedicated to support technically the construction phase of the project for the EPC contractor. One of the tasks out of technical support was to monitor and report site activity progress (cable routes, cables, terminations, equipment installation) with our site management software.
Great Britain
Customer:
CNIM SA
Introduction/challenge:
Our site engineers were responsible to support the cabling works contractor on the site to make the link between the studies and the erection phase.
Sweden
Customer:
Elsta Sweden AB
Introduction/challenge:
Our site engineer was responsible for general project management including coordination of all electrical works during the factory outage. His responsibility was to coordinate works with the End Client, supervise all technical aspects and site tests as well as to prepare any necessary technical and site documentation.
VAT No 6832105801
KRS 0000791839
REGON 383681032
Enetecs sp. z o.o. is registered in the District Court for Kraków Śródmieście, XII Commercial Division, share capital: PLN 5.000
PLN 88 1050 1445 1000 0090 3218 0524
EUR 66 1050 1445 1000 0090 3218 0532
GBP 32 1050 1445 1000 0090 8090 0849
SWIFT/BIC INGBPLPW